Project Highlight: Aliyans – Membrane Waterproofing (Ongoing Project)
Project Summary
Client: Aliyans
Project Description: Sheal Well
Location: 6 Kilo, Afinchober
Project Type: Membrane Waterproofing
Area Completed: Up to 800 m² (ongoing)
Scope of Work
Musedif Construction Chemicals has been engaged to deliver a full membrane waterproofing system for the sheal well structure.
Our scope includes:
-
Thorough surface assessment and preparation
-
Application of durable membrane waterproofing systems
-
Sealing of all critical joints and moisture-prone areas
-
Continuous quality checks throughout the ongoing work
Why Membrane Waterproofing?
Membrane waterproofing is ideal for sheal well structures due to its exceptional resistance to moisture, flexibility, and long-term durability. It provides continuous protection against groundwater intrusion and structural deterioration.
Our Expertise in Action
Our technical team is applying advanced installation methods using premium-grade waterproofing materials. Each phase is executed with precision to ensure long-lasting protection and compliance with the project’s requirements.
Progress & Outcome (Ongoing)
To date, up to 800 m² of membrane waterproofing has been successfully applied. The project is progressing smoothly with consistent quality and adherence to schedule. Upon completion, the sheal well will be fully protected against water penetration and long-term moisture damage.
Client Satisfaction
The client, Aliyans, has expressed satisfaction with the quality and steady progress of the work. Our commitment to high standards continues to reinforce Musedif Construction Chemicals’ reliability in delivering effective waterproofing solutions.




